{"page":{"id":346,"title":"Cancel or Change an Order","handle":"cancel-change-order","url":"https://revtee.shop/cancel-change-order/","body_html":"<p class=\"policy-updated\">Last updated: <time datetime=\"2026-11-17\">November 17, 2026</time></p>\n<p>Plans change on the road. A rider drops out of the run. Someone remembers they wear a 3XL, not a 2XL. The crew name went in with one wrong letter. This page explains how to cancel a Rev Tee order or change it, how long you have, what can be changed and how fast your money comes back when an order is cancelled. The short version: you have 24 hours from placing your order, and one email does it.</p>\n<section class=\"policy-summary\">\n<h2>At a glance</h2>\n<ul>\n<li><strong>Window:</strong> within 24 hours of placing your order.</li>\n<li><strong>Cancel:</strong> the whole order or single items, inside the 24 hours.</li>\n<li><strong>Change:</strong> size, color, design option, personalisation text, quantity and shipping address, inside the 24 hours.</li>\n<li><strong>Refund for a cancellation:</strong> sent within 7 days of the confirmed cancellation, to your original payment method or as store credit if you ask.</li>\n<li><strong>After 24 hours:</strong> your order is printed as placed. It can still be returned within 60 days of delivery on a free label.</li>\n<li><strong>How:</strong> email <a href=\"mailto:support@revtee.shop\">support@revtee.shop</a> with your order number.</li>\n</ul>\n</section>\n<h2>1. The 24-hour window</h2>\n<p>Every Rev Tee order has a 24-hour window for cancelling or changing it. The window starts at the time on your order confirmation email. Order at 8 p.m. on a Thursday after bike night, and you have until 8 p.m. on Friday.</p>\n<p>The window is the same for every product and every order size. One sticker sheet or a crew order of nine hoodies, you get 24 hours. It covers personalised pieces too, which is where most change requests come from.</p>\n<p>Your request counts when your email reaches us inside the window. Send it as soon as you notice the problem. There is no reason to wait until hour 23.</p>\n<h2>2. How to ask for a cancellation or a change</h2>\n<ol>\n<li><strong>Write to us.</strong> Email <a href=\"mailto:support@revtee.shop\">support@revtee.shop</a> or <a href=\"/submit-ticket/\">submit a ticket</a>.</li>\n<li><strong>Use a clear subject.</strong> &#8220;Cancel&#8221; or &#8220;Change&#8221;, plus your order number.</li>\n<li><strong>Use the checkout email.</strong> Write from the email address you used to order, or include it in the message, so we can match you to the order.</li>\n<li><strong>Say exactly what you want.</strong> &#8220;Cancel the whole order.&#8221; Or &#8220;Change the second cart line from L to 2XL.&#8221; Or &#8220;The crew name should read Ridge Riders.&#8221;</li>\n<li><strong>Wait for our confirmation.</strong> We reply within 24 hours on business days. Your cancellation or change is done once you have our confirmation email.</li>\n</ol>\n<p>Your order number is in your confirmation email. If you have an account, you can also find it in <a href=\"/my-account/\">My Account</a>.</p>\n<h2>3. What can change inside the window</h2>\n<table class=\"policy-table\">\n<caption>Changes you can ask for within 24 hours of ordering</caption>\n<thead>\n<tr>\n<th scope=\"col\">Change</th>\n<th scope=\"col\">Example</th>\n<th scope=\"col\">What to tell us</th>\n</tr>\n</thead>\n<tbody>\n<tr>\n<td>Size</td>\n<td>A rider needs a 3XL instead of a 2XL</td>\n<td>The cart line and the new size</td>\n</tr>\n<tr>\n<td>Color or style option</td>\n<td>A different color option, or the trucker cap instead of the dad cap</td>\n<td>The cart line and the new option</td>\n</tr>\n<tr>\n<td>Personalisation text</td>\n<td>Ridge Runners should read Ridge Riders</td>\n<td>The exact new text, spelled the way it should print</td>\n</tr>\n<tr>\n<td>Year field</td>\n<td>The year on the design should match this season</td>\n<td>The year as it should appear</td>\n</tr>\n<tr>\n<td>Quantity</td>\n<td>One more tee for a rider who joined the run</td>\n<td>The item, size and how many</td>\n</tr>\n<tr>\n<td>Remove an item</td>\n<td>A rider dropped out of the rally week</td>\n<td>The cart line to remove</td>\n</tr>\n<tr>\n<td>Shipping address</td>\n<td>The gift should go to the rider, not to you</td>\n<td>The full new address</td>\n</tr>\n</tbody>\n</table>\n<p>If a change affects the price, we tell you before anything happens. Going up a size range adds the size add-on: 2XL and 3XL are +$2, and 4XL and 5XL are +$4. Ticking the front chest mark on the custom tee adds $4. Our reply explains how the difference is handled for your order. Sometimes the cleanest route is to cancel and place a fresh order, and we will say so if that is the case.</p>\n<h2>4. Personalised orders: read the preview, then breathe</h2>\n<p>We print exactly what you type in the rider name, crew name and year fields. We do not send a proof first. The live preview on the product page is the check, so look at it before you add to cart. Read each name out loud. Check the spacing and capitals.</p>\n<h3>Worked example: one letter off</h3>\n<p>Your crew rides as the Ridge Riders. The order went in as Ridge Runners. You catch it the next morning, inside 24 hours. Email us with the order number and the correct spelling, and we change it. The shirts print the right way and nobody at the gas stop ever knows.</p>\n<h3>Worked example: caught it too late</h3>\n<p>Same typo, but you spot it two days later. By then the order is printed as typed. The shirts can still come back within 60 days of delivery on a free label, under our <a href=\"/returns-exchanges-policy/\">Returns &amp; Exchanges Policy</a>, and you can place a new order with the correct name.</p>\n<h3>Crew order tip</h3>\n<p>Before the road captain checks out, send the cart summary to the group chat. Let each rider confirm their own size and name. Nine people checking their own line catch more than one person checking all nine.</p>\n<h2>5. After the 24 hours</h2>\n<p>Once 24 hours have passed, the order is printed as placed. We cannot cancel it or change the size, option or text at that point. You are not stuck, though.</p>\n<ul>\n<li><strong>Wrong size or changed your mind:</strong> every product can be returned within 60 days of delivery, for any reason, on a free label we email you.</li>\n<li><strong>Personalised piece printed with a typo you entered:</strong> it can be returned within 60 days too.</li>\n<li><strong>Our mistake:</strong> if the print does not match what you typed, or something arrives damaged or wrong, send photos within 60 days and we send a free label or fix it at no cost.</li>\n<li><strong>Address problem:</strong> contact us right away with the order number and the correct address. We will help with whatever options are still open.</li>\n</ul>\n<p>Shipping times for each stage, from getting ready to arriving at your door, are on our <a href=\"/shipping-delivery/\">Shipping &amp; Delivery</a> page.</p>\n<h2>6. Your refund when an order is cancelled</h2>\n<p>When we confirm your cancellation, your refund is sent within 7 days of the confirmed cancellation. It goes back to your original payment method in US dollars. If you prefer, ask for store credit instead. Store credit never expires.</p>\n<p>Cancel the whole order and the full amount you paid comes back. Cancel one item and the price of that item comes back, including any size add-on or the front chest mark add-on that was part of its price. There is no fee for cancelling. For the full money picture, see our <a href=\"/refund-policy/\">Refund Policy</a>.</p>\n<h2>7. Changes that start a new clock</h2>\n<p>A change inside the window does not shorten anything for you. Your order still gets 1–3 business days to get ready once the change is confirmed, then 7–14 business days in transit. If a ride date is close, factor that in. Order to door is about 8–17 business days.</p>\n<p>If you are counting back from a rally or a last ride of the season, and a change puts the date at risk, tell us the date in your email. We will be honest about the timing.</p>\n<h2>8. A quick check before you pay</h2>\n<p>The best change request is the one you never have to send. Before you hit the checkout button, run through this list. It takes about a minute, and it covers almost every change we get asked for.</p>\n<ul>\n<li><strong>Sizes:</strong> one cart line per rider, each with its own size from S to 5XL. Count the lines against the riders on the run.</li>\n<li><strong>Names:</strong> read each rider name and crew name in the live preview. Watch for doubled letters and swapped vowels.</li>\n<li><strong>Year:</strong> check the year field matches the season or the event you have in mind.</li>\n<li><strong>Options:</strong> confirm the color, cap style, mug size or poster size you picked is the one you meant. Mugs come in 11 oz and 15 oz. Posters come in 12 x 18, 18 x 24 and 24 x 36 in.</li>\n<li><strong>Add-ons:</strong> make sure the front chest mark on the custom tee is ticked only if you want it.</li>\n<li><strong>Address:</strong> street, unit number, city, ZIP or postal code. For a gift, decide whose door it should land at.</li>\n<li><strong>Email:</strong> use an address you check. Our confirmation and any reply about changes go there.</li>\n</ul>\n<h2>9. Changing where a gift is going</h2>\n<p>Gift orders are the most common address change. A partner orders a birthday hoodie, ships it home, then decides it should go straight to the rider&#8217;s workplace or a relative&#8217;s house for the party. Inside 24 hours, email us the full new address and we update it.</p>\n<p>The new address must be in one of the four countries we ship to: the United States, Canada, Australia or New Zealand. Shipping stays free to all four. Moving a gift from a US address to a Canadian one is fine, and the transit estimate stays 7–14 business days. Duties and taxes, if any, depend on the destination country.</p>\n<p>If you only realise the address is wrong after the 24 hours, email us anyway with the order number. Tell us what happened and we will help with the options that are still open.</p>\n<h2>10. When we cancel an order</h2>\n<p>Rarely, we may need to cancel an order ourselves. For example, a payment may not go through, or an address cannot be delivered to in the four countries we ship to. If that happens, we email you and explain why. Any amount you paid is refunded within 7 days of that confirmed cancellation, the same as a cancellation you asked for.</p>\n<h2>11. Common questions about changes</h2>\n<h3>Can I add a shirt for a rider who joined late?</h3>\n<p>Inside the 24 hours, yes. Tell us the item, size and any name it needs. After the window, place a new order for that rider. Shipping is free either way.</p>\n<h3>Can I switch from a tee to a hoodie?</h3>\n<p>Inside the 24 hours, yes. Name the cart line and the new product. If the price differs, we tell you how it is handled before we change anything.</p>\n<h3>I ordered twice by mistake. What now?</h3>\n<p>Email us within 24 hours of the second order with both order numbers and tell us which to cancel. The refund for the cancelled order is sent within 7 days of the confirmed cancellation.</p>\n<h3>Can I change the size on a gift I already gave?</h3>\n<p>If the order is past the 24 hours, the gift can come back within 60 days of delivery on our free label, and a new size can be ordered. Our <a href=\"/size-guide/\">Size Guide</a> helps with the next pick.</p>\n<h3>I emailed on a Saturday. Does my request still count?</h3>\n<p>Yes. What matters is that your email reaches us within 24 hours of placing the order. Our reply comes within 24 hours on business days, so a weekend message may be answered on Monday. Your request is still timed from when you sent it.</p>\n<h3>Can I cancel only the personalised items and leave the rest?</h3>\n<p>Inside the 24 hours, yes. Tell us which cart lines to cancel. The rest of the order carries on as normal, and the refund for the cancelled lines is sent within 7 days of the confirmed cancellation.</p>\n<h3>Where do I check the status of my order?</h3>\n<p>Use our <a href=\"/order-tracking/\">Order Tracking</a> page with your order number and the email used at checkout.</p>\n<h2>12. Reach us</h2>\n<p>For anything about an order you just placed, email <a href=\"mailto:support@revtee.shop\">support@revtee.shop</a> with your order number in the subject line. We reply within 24 hours on business days. More answers live in our <a href=\"/faqs/\">FAQs</a> and the <a href=\"/help-center/\">Help Center</a>. Kickstands up, and ride safe.</p>\n","visible_characters":10326,"meta_description":"Cancel or change size, text or address within 24 hours of ordering. Refunds for cancelled orders are sent within 7 days of the confirmed cancellation.","parent":null,"published_at":"2026-11-17T00:25:16+00:00","updated_at":"2026-11-17T00:25:16+00:00"}}